ADOP PATCHING
ADOP PHASES
--------------------
ADOP PHASES
--------------------
prepare : Prepare the instance for online patching. apply : Apply patch(es) to the Patch Edition. finalize : Ready the instance for cutover. abort : Abort the patching cycle. cutover : Promote the Patch Edition to Run Edition. cleanup : Drop obsolete objects and seed data from Old Editions. actualize_all : Actualize all objects in the Patch Edition. cleanup_full : Cleanup and drop Old Editions. abandon : yes|no - Abandon failed patches.
ADOP PATCH LOG DIRECTORY
-----------------------
<INSTALL BASE>/fs_ne/EBSapps/log/adopADOP PATCH PROCESS CYCLE STEPS------------------------------
Download any required technology patches and unzip the contents.The patch contents may be unzipped into $NE_BASE/EBSapps/patch. 1. Prepare the system for patching. source <EBS_ROOT>/EBSapps.env run $ adop phase=prepare 2. Apply technology patches to the Oracle Home under the Patch f/susing the information below. source <EBS_ROOT>/EBSapps.env patch 3. Apply any Oracle E-Business Suite patches planned for this patching cycle $ adop phase=apply patches=<patch_list> 4. After all patches have been successfully applied, complete the patching cycle. $ adop phase=finalize $ adop phase=cutover Note: Below steps can be done when applications are up and running 5. source <EBS_ROOT>/EBSapps.env run $ adop phase=cleanup 6. To complete the process and synchronize the technology level between patchand run f/s. $ adop phase=fs_clone
Adop hotpatch steps (we cannot abort hotpatch and abondon cannot be done):Hotpatch which can apply directly on run fs$ adop phase=apply patches=<patch_list> hotpatch=yes After hotpatch please run phase=cleanup and phase=fs_cloneto sync the run fs with patch fs to prepare for next patching cycle
No comments:
Post a Comment